Steel plate moving through Regal Industrial's automated blast and prime preservation line
Plate preparation for fabrication

STEEL PLATE BLASTING AND PRIMING

BLAST & PRIME PLATE LINE

Automated abrasive blasting and inorganic zinc preconstruction priming in one continuous plate-preservation process at our Donora, Pennsylvania facility.

Explore Service

AUTOMATED LINE

Continuous plate preservation

SP5 / SP10

Specified blast finishes

FABRICATION READY

Protected for downstream work

Service overview

Automated Plate Preservation Before Fabrication

Regal Industrial's Donora facility operates an automated plate preservation line that produces a media-blasted surface profile and applies an inorganic zinc preconstruction primer in a single continuous process. The line prepares plate to an SSPC-SP5 or SSPC-SP10 finish with a 2-2.5 mil surface profile.

Preconstruction primer provides immediate corrosion protection after blasting and is designed to support downstream plasma cutting, bending, rolling, and welding. The complete program can be coordinated with Regal's plate cutting, fabrication, advanced coating, rail, and flatbed trucking capabilities.

Project value

Benefits Built Into the Program

Immediate Protection

Inorganic zinc preconstruction primer is applied immediately after blasting to preserve the prepared steel surface during storage and processing.

Fabrication Ready

Primed plate can proceed to plasma cutting, bending, rolling, and welding with minimal disruption to downstream production.

One-Facility Workflow

Blasting, priming, cutting, welding, advanced coatings, rail access, and flatbed trucking can be coordinated through the Donora operation.

2-7/8 in.

Maximum thickness

120 in.

Maximum width

960 in.

Maximum length

SP5 / SP10

Blast finish

Execution

Application and Inspection Methods

1

Material and Specification Review

Confirm plate sizes, condition, cleanliness standard, surface-profile range, primer product, target thickness, and handling requirements.

2

Abrasive Blast Cleaning

Clean the steel to the specified SSPC/NACE preparation standard and establish the required anchor profile.

3

Primer Application

Apply the approved preconstruction or holding primer within the permitted time window and environmental conditions.

4

Verification and Handling

Document preparation and coating checks, address approved repairs, and handle finished plate to reduce coating damage before delivery.

Representative Applications

Typical project types supported by this service include:

Bridge and structural plate
Plate for tanks and vessels
Heavy fabrication material
Marine and water-control components
Industrial equipment plate
Plate requiring temporary corrosion protection

Inside the operation

See the Process and Equipment

Vacuum lifting equipment handling steel plate at Regal Industrial
Prepared steel plate exiting the automated preservation line
Automated blast and prime plate line equipment in the Donora facility

Plan Your Next Coating Project

Provide the plate list, dimensions, preparation standard, approved primer, target thickness, fabrication requirements, and delivery schedule for review.